SahayamNew electricity connection, and changing the name on the billతె
TG

New electricity connection, and changing the name on the bill

You learn how to get a new electricity connection for a home or a shop, and how to change the name on the bill after buying a house or after a death in the family: the documents, the charges and the time limits.

About this guidePending verification

Published on 12-11-2026. Not every fact has been checked against its official source yet: confirm at the office.

Where:OnlineAt a MeeSeva centreAt the office

For whom: Anyone in Telangana who needs a new electricity meter for a home or a shop, or needs an existing connection moved into their name. For farm and industrial connections this guide only points the way.

1Your situation

We show only what your answers need.

What do you need?
What is the connection for?
Why does the name need to change?
Which district is the property in? (The power company depends on the district; its name is also on the bill)

Your answers stay on this phone.

2Documents you need

Tick the ones you have. They are kept in this browser.

  • Details

    Any one of: Aadhaar card, driving licence, PAN card, voter ID, passport (the company's 2018 circular also names the ration card). For a name change, a self-attested copy.

    Sources: 4, 6, 9

  • Details

    The MeeSeva portal's list for this service says "ID Proof" without naming the cards; for a new connection it also lists a copy of the Aadhaar card.

    Not confirmed: Which identity cards count is not confirmed: we could not open TGNPDCL's own page again. Ask at the MeeSeva centre or the section office.

    Sources: 19

  • Details

    A registered sale deed, gift deed or lease deed.

    Sources: 4, 6

  • Details

    The company's application form names: sale deed, allotment or possession letter, lease deed, municipal tax payment receipt. The MeeSeva portal's list has: ownership certificate, sale deed or gift deed.

    Sources: 12, 19

  • Details

    A lease or rental deed with the landlord; or your electoral identity card, passport or PAN card, together with the landlord's proof of ownership.

    Sources: 12

  • Details

    Not confirmed: The form's words are "Indemnity Bond (Letter of consent from landlord to tenant/ lessee/ occupier)"; it gives no format or stamp paper value. Ask at the section office or the MeeSeva centre.

    Sources: 12

  • Details

    The MeeSeva portal's list calls it "Wiring Certificate".

    Sources: 12, 19

  • Details

    Sources: 12

  • Details

    If you don't have it: The format is on the TGSPDCL website under "Download Forms", as "Indemnity Bond Proforma".

    Sources: 4, 1, 18

  • Details

    Uploaded with the online application.

    Sources: 5

  • Details

    Not confirmed: The MeeSeva portal's list says only "Photo", and the application form has a box for the customer's photo; neither gives a size or a number. Ask at the MeeSeva centre.

    Sources: 19, 12

  • Details

    Sources: 5, 4

  • Details

    Sources: 19, 12

  • Details

    Not confirmed: The MeeSeva portal's list does not say which permission (building permission or another) it means. Ask at the MeeSeva centre.

    Sources: 19

  • Details

    If you don't have it: The format is on the TGSPDCL website under "Download Forms", as "Indemnity Bond for Title Transfer".

    Sources: 9, 1, 18

  • Details

    Any one of: registered sale deed, partnership deed, will deed, or any other registered ownership document

    Sources: 9

  • Details

    If you don't have it: The format is in TGSPDCL's "Download Forms", as "No-Objection cum Consent Letter".

    Sources: 9, 1, 18

  • Details

    Sources: 9

  • Details

    Not confirmed: For this guide we did not check who issues this certificate or how; ask at a MeeSeva centre.

    Sources: 9

  • Details

    Not confirmed: The portal does not say what this document is, where you get it or who signs it; we could not open TGNPDCL's own page again. Ask at the MeeSeva centre or the section office.

    Sources: 19

  • Details

    Not confirmed: The MeeSeva portal lists it as mandatory but gives no format or stamp paper value. Ask at the MeeSeva centre.

    Sources: 19

  • Details

    Sources: 19

    3Your steps

    · Do them in order. Tick each one when it is done.

    1. Do this now

      Before you apply, check: the house wiring is complete (the company advises good wire and MCBs), there is an earth pit, the meter board is outside or in the veranda at least 5 feet above the ground, and the service pipe runs visibly on the wall.

      There must be no electricity dues on the premises or in your name anywhere. Buildings of 15 metres and taller need CEIG approval.

      Where
      You do this yourself

      Sources: 8

    2. Do this now

      On the TGSPDCL website open the "LT New Service" application and register with the OTP sent to your mobile.

      Upload the documents and pay the fee online or by DD. You get an acknowledgement and an SMS; keep the application number. If you cannot apply online, you can apply at the nearest section office or Customer Service Centre.

      Where
      Online
      Fee
      A home, 1 kW (1000 watts): development charges ₹1,200 + security deposit ₹200 + application fee ₹25 = ₹1,425. A shop, 1 kW: ₹1,200 + ₹800 + ₹50 = ₹2,050. 18% GST is added to the application fee and the development charges. On top of these come service line charges: since 19 January 2026, for a connection by overhead line within 1 km of the existing network, a fixed charge by load (a TGERC regulation), added to the total when you register. A home: ₹500 up to 1 kW; above 1 kW up to 5 kW, ₹500 plus ₹600 for each kW or part of one. A shop: ₹1,000 up to 1 kW; above 1 kW up to 5 kW, ₹1,000 plus ₹1,200 a kW. Higher rates above 5 kW. For apartments and commercial complexes the whole building's load counts. For these connections the company provides the transformer at its own cost. Beyond 1 km, service line charges are by estimate.
      Time limit
      working days: to process the application and tell you the charges when the existing network can supply you (7 days when the network has to be extended)
      Open the official page
      Not confirmed

      The regulation does not say clearly whether the ₹600 (₹1,200 for a shop) between 1 and 5 kW is for each kW of the whole load or only for the load above 1 kW. The amount for your load is shown when you register; if in doubt, ask at the section office.

      Sources: 1, 4, 5, 7, 2, 3, 17

    3. Do this now

      An officer checks your documents and the AE (Operation) visits the premises.

      If a document is not right, you get an SMS with the reason and a link to upload it again; upload the right document with that link. You can follow the application under "My Application Status".

      Where
      Online
      Open the official page

      Sources: 7, 1

    4. Do this now

      For a connection by overhead line within 1 km of the existing network, the new line work is covered by the fixed service line charges paid with the application, and the company provides the transformer free; there is no separate estimate.

      Only if new poles or a line are needed beyond 1 km is an estimate prepared and sanctioned. If you are asked to pay it, pay under "Payment against estimation" on the TGSPDCL website or by DD, and keep the receipt.

      Where
      Online
      Fee
      Beyond 1 km, as estimated (depends on the work and the distance); within 1 km, nothing more
      Time limit
      after you pay the charges, to extend the line and give an LT connection
      Open the official page

      Sources: 7, 1, 4, 3, 2, 17

    5. Do this now

      The staff fix the meter and give supply.

      Sign the test report. Ask for a receipt for every payment; the company itself says not to go through middlemen or brokers.

      Where
      You do this yourself
      Time limit
      from the complete application with the charges, when the existing network can supply you

      Sources: 7, 8, 3, 2

    6. Do this now

      First have the house wiring completed by a licensed electrical contractor, and get the contractor's wiring completion report.

      TGNPDCL's application form asks for the contractor's name, licence number and address, whether the service pipe is visible outside, whether there is already a connection in the same premises (with its service connection number), and which appliances of how many watts (the load); have these details ready.

      Where
      You do this yourself

      Sources: 12

    7. Do this now

      Apply for a new connection at the nearest MeeSeva centre, or online through "New Service Connection" on the TGNPDCL website.

      Hand in the documents, pay the charges and keep the receipt.

      Where
      At a MeeSeva centre
      Fee
      Application fee with 18% GST: ₹30 for a home, ₹59 for a shop. A home: development charges ₹600 up to 500 watts, ₹1,200 for 501–1000 watts, above that ₹1,200 + ₹1,200 per kW (18% GST is added to the development charges: ₹1,416 for 1 kW); security deposit ₹80 up to 250 watts, above that ₹200 per kW. A shop: development charges ₹300 up to 250 watts, ₹600 for 251–500 watts, ₹1,200 for 501–1000 watts, above that ₹1,200 + ₹1,200 per kW; security deposit ₹800 per kW. On top of these come service line charges: since 19 January 2026, for a connection by overhead line within 1 km of the existing network, a fixed charge by load (a TGERC regulation for all of Telangana): a home ₹500 up to 1 kW, above 1 kW up to 5 kW ₹500 plus ₹600 a kW; a shop ₹1,000 up to 1 kW, above 1 kW up to 5 kW ₹1,000 plus ₹1,200 a kW; higher rates above 5 kW. The company provides the transformer at its own cost. Beyond 1 km, by estimate. At a MeeSeva centre, the MeeSeva service charge for this service is ₹80 (with GST).
      Time limit
      working days: to process the application and tell you the charges when the existing network can supply you (7 days when the network has to be extended)
      Open the official page
      Not confirmed

      TGNPDCL's charges table carries no date (it bears the company's old name, TSNPDCL); TGNPDCL's pages do not yet show the new service line charges. The regulation does not say clearly whether the per-kW rate between 1 and 5 kW is for the whole load or only the load above 1 kW. Ask at MeeSeva and get a receipt for every amount.

      Sources: 13, 4, 19, 11, 12, 3, 17

    8. Do this now

      Within 1 km of the existing network, the new line work is covered by the fixed service line charges paid with the application, and the company provides the transformer free.

      If new poles or a line are needed beyond 1 km, pay the estimate you are given. Then the staff fix the meter and give supply. You can follow the application under "Know Your Application Status" on the TGNPDCL website.

      Where
      You do this yourself
      Time limit
      from the complete application with the charges (when the existing network is enough); when the line has to be extended, within 30 days of paying the charges

      Sources: 11, 3, 17

    9. Do this now

      When a house changes hands, TGSPDCL says the present holder of the connection (the seller) should ask the ICSC in writing for a "special reading" at least 15 days ahead.

      Where
      TGSPDCL Integrated Customer Service Centre (ICSC)

      Sources: 8

    10. Do this now

      On the TGSPDCL website open "Consumer Service Request" and choose title transfer (name change).

      Enter the service number, upload the documents and pay the fee. You can pay online, by DD, at the ERO counter, or with the QR code at a Customer Service Centre.

      Where
      Online
      Fee
      Home connection (Category I): ₹29.50 (₹25 + 18% GST). Shop (Category II): ₹59 (₹50 + 18% GST).
      Time limit
      after the application with the required documents and fee
      Open the official page

      Sources: 1, 9, 2, 3

    11. Do this now

      Apply for the name change of the connection at a MeeSeva centre (the service is listed there as NPDCL "NAME CHANGE").

      The company's application form has a title transfer part that asks for the present consumer's name, the new consumer's name and the service connection number, and it has a place for the signature of the original owner. On the form you declare that you owe the company no dues and that no case of theft or unauthorised use of electricity is pending against you.

      Where
      At a MeeSeva centre
      Fee
      MeeSeva service charge: ₹80 (with GST). The company's own name change fee is not confirmed.
      Time limit
      after the application with the required documents and fee
      Not confirmed

      We could not open TGNPDCL's own name change page again, so two things we read there earlier are not confirmed: that the new owner signs a fresh agreement and test report, and that the old and new owners sign a declaration on stamp paper. The pages we hold do not give the company's own name change fee. Ask at the MeeSeva centre or the section office.

      Sources: 19, 12, 3

    12. Do this now

      Apply for the name change of the connection at a MeeSeva centre (the service is listed there as NPDCL "NAME CHANGE").

      The company's application form has a title transfer part that asks for the present consumer's name, the new consumer's name and the service connection number. The form still has a place for the signature of the original owner: the pages we read give no separate rule for a death, so ask the section office what to give in its place. On the form you declare that you owe the company no dues and that no case of theft or unauthorised use of electricity is pending against you.

      Where
      At a MeeSeva centre
      Fee
      MeeSeva service charge: ₹80 (with GST). The company's own name change fee is not confirmed.
      Time limit
      after the application with the required documents and fee
      Not confirmed

      We could not open TGNPDCL's own name change page again, so two things we read there earlier are not confirmed: that the new owner signs a fresh agreement and test report, and that the old and new owners sign a declaration on stamp paper. The pages we hold do not give the company's own name change fee. They also do not say which papers prove the death and your right to the connection. Ask at the MeeSeva centre or the section office.

      Sources: 19, 12, 3

    If something goes wrong

    If it is rejectedIf the application is rejected, ask for the reason (TGSPDCL sends it by SMS with a link to upload again).

    If the application is rejected, ask for the reason (TGSPDCL sends it by SMS with a link to upload again). If that does not settle it, complain to your area's ADE (Operation), then the DE (Operation). If it is still not settled, go to your company's CGRF (Consumer Grievance Redressal Forum); new connections and name changes are within its scope.

    Your area's ADE / DE (Operation), then the CGRF

    Sources: 7, 10, 15

    If it is rejectedIf the application is rejected, ask for the reason at the MeeSeva centre or the office where you applied.

    If the application is rejected, ask for the reason at the MeeSeva centre or the office where you applied. If that does not settle it, go to TGNPDCL's CGRF (Consumer Grievance Redressal Forum); new connections and name changes are within its scope.

    TGNPDCL CGRF (Consumer Grievance Redressal Forum)

    Sources: 15

    If it is lateIf the time limit passes, call 1912 (24 hours, free), register a complaint and note its number; then go to the ADE and DE (Operation).

    If the time limit passes, call 1912 (24 hours, free), register a complaint and note its number; then go to the ADE and DE (Operation). The regulation sets ₹200 compensation for each day of delay; you can claim it at the CGRF.

    Electricity complaints number 1912

    Sources: 1, 10, 3, 15

    If it is lateIf the time limit passes, call 18004250028 or 1912 (both work 24 hours), register a complaint and note its number.

    If the time limit passes, call 18004250028 or 1912 (both work 24 hours), register a complaint and note its number. The regulation sets ₹200 compensation for each day of delay; you can claim it at TGNPDCL's CGRF.

    TGNPDCL complaints number 18004250028 (or 1912)

    Sources: 11, 3, 15

    AlsoYou can complain to the CGRF online, in person, by post or by e-mail; you must get an acknowledgement.

    You can complain to the CGRF online, in person, by post or by e-mail; you must get an acknowledgement. Complain within two years of the problem. On complaints such as a new connection or a name change, the order is due within 45 days (15 days for no supply or disconnection).

    TGSPDCL CGRF (Consumer Grievance Redressal Forum) · Open the official page

    Sources: 1, 15

    AlsoCGRF Warangal (Hanumakonda, Warangal, Jangaon, Mulugu, Bhoopalpally, Mahabubabad, Karimnagar, Peddapalli, Khammam, Kothagudem): phone 0870-2461551.

    CGRF Warangal (Hanumakonda, Warangal, Jangaon, Mulugu, Bhoopalpally, Mahabubabad, Karimnagar, Peddapalli, Khammam, Kothagudem): phone 0870-2461551. CGRF Nizamabad (Nizamabad, Kamareddy, Adilabad, Nirmal, Mancherial, Komaram Bheem Asifabad, Jagtial, Rajanna Sircilla): phone 08462-295942. Go to the forum for your district. You can complain in person, by post, by e-mail or online (the TGNPDCL website has an online complaint form); you must get an acknowledgement. Complain within two years of the problem. On complaints such as a new connection or a name change, the order is due within 45 days (15 days for no supply or disconnection).

    TGNPDCL CGRF (Warangal / Nizamabad) · Open the official page

    Sources: 14, 11, 15

    AlsoIf you are not satisfied with the CGRF's order, or no order comes in time, you can appeal to the Vidyut Ombudsman of Telangana within 45 days of receiving the order.

    If you are not satisfied with the CGRF's order, or no order comes in time, you can appeal to the Vidyut Ombudsman of Telangana within 45 days of receiving the order. If the CGRF assessed an amount you must pay, one third of it is deposited first. The Ombudsman's order is due within 60 days. The office is on the first floor of the 33/11 kV substation beside the Hyderabad Boat Club, near Lumbini Park, Hyderabad 500004; phone 8500827424.

    Vidyut Ombudsman, Telangana · Open the official page

    Sources: 15, 16

    If you are asked for more moneyTGSPDCL says not to go to middlemen or brokers, and to insist on a receipt for every payment and an acknowledgement for every application.

    TGSPDCL says not to go to middlemen or brokers, and to insist on a receipt for every payment and an acknowledgement for every application. If you are asked for more than the charges above, ask for a receipt and complain on 1912.

    Electricity complaints number 1912

    Sources: 8, 1

    If you are asked for more moneyThe company's application form ends with an acknowledgement that shows the total payment received, signed and stamped by the receiving officer: ask for it.

    The company's application form ends with an acknowledgement that shows the total payment received, signed and stamped by the receiving officer: ask for it. If you are asked for more than the charges above, ask for a receipt and complain on 18004250028 or 1912.

    TGNPDCL complaints number 18004250028 (or 1912)

    Sources: 12, 11

    Find the office in your district →

    Related guides

    Report a mistake on this page
    The 19 official pages and papers this guide is written from
    1. TGSPDCL website: Consumer Services, FAQs and CGRFSouthern Power Distribution Company of Telangana Limited (TGSPDCL), a Government of Telangana company, FAQs: "Which districts does TGSPDCL cover?" (15 districts), "How do I apply for a new electricity connection?", GST on the application fee and development charges (18%); Consumer Services links: LT New Service (webportal.tgsouthernpower.org/onlinecsc/), Consumer Service Request (/onlinecsc/CC), Payment against estimation, My Application Status, CGRF; Ease of Doing Business reforms 56 (TG-iPASS for industrial connections) and 91 (name change in electricity bills); 24x7 toll-free 1912; Consumer Services > New Service > Documents & Connection Charges: application fee (Cat I & V ₹25, others ₹50), the note "USLC Charges will be calculated based on the load and will be added to Total at the time of Registration", and the older line that service line charges for a line extension are by site estimation · read on 01-11-2026
    2. TGSPDCL Citizen's Charter: Standards of PerformanceSouthern Power Distribution Company of Telangana Limited (TGSPDCL), Processing of application (2 working days); release when feasible from the existing network (30 days of the application with charges); LT release needing network expansion (7 days to process, 30 days after the charges); title transfer of ownership (7 days, on receipt of documents and fee) · read on 01-11-2026
    3. Schedule II, Regulation No.5 of 2016: Guaranteed Standards of Performance and Compensation to Consumers in Case of DefaultTelangana State Electricity Regulatory Commission (copy published by TGNPDCL), Items VIII (processing of application: 2 working days; LT with network expansion: 7 days), IX (release on payment of all charges: 30 days; LT with network expansion: 30 days of charges; Rs.200 for each day of default) and X (title transfer: 7 days with documents and fee; Rs.200 for each day of default, as laid out in the table) · read on 01-11-2026
    4. Documents and Connection Charges for New ServicesSouthern Power Distribution Company of Telangana Limited (TGSPDCL), For LT services: documents to upload (ID proof; registered sale, gift or lease deed); table of charges (Category I Domestic 1000 W: DC 1200, SD 200, fee 25, total 1425; Category II 1000 W: 1200, 800, 50, total 2050); notes (pass book or patta for agriculture, MRO certificate for SC/ST, indemnity bond on Rs.100 non-judicial stamp paper if no registered document, service line charges by estimate); HT (CEIG approval before release); DC under Regulation 4 of 2013, SD under Regulation 3 of 2013 · read on 01-11-2026
    5. Documents to be furnished for New Service Registration (Download Forms)Southern Power Distribution Company of Telangana Limited (TGSPDCL), B) For LT services: ID proof, ownership documents, pass book or patta (agriculture), certificate from MRO (SC/ST only), passport size photo to upload · read on 01-11-2026
    6. Circular Memo No. CGM(C)/SE(C)/DE(C)/ADE-V/EODB/D.No.226318, dt. 3-12-2018: documents for new electricity connections reducedSouthern Power Distribution Company of Telangana Limited (TGSPDCL), Chief General Manager (Commercial), New connections released on these documents only: ID proof (Aadhaar card, driving licence, PAN card, ration card, voter ID, passport), ownership documents (registered sale, gift or lease deed), authorisation document for a firm or company (03-12-2018) · read on 01-11-2026
    7. New Service Connection (NRS): Process FlowchartSouthern Power Distribution Company of Telangana Limited (TGSPDCL), Online registration with OTP and document upload; fees (application fee, SD, DC, service line charges) online or by DD; acknowledgement and SMS; document verification, re-upload link by SMS with the reason; field verification by AE (Operation); estimate when lines are needed; meter issue; test report signed by the consumer · read on 01-11-2026
    8. Advice / Guidelines & Caution to ConsumersSouthern Power Distribution Company of Telangana Limited (TGSPDCL), No arrears at the premises or in the applicant's name; wiring complete, MCBs, earthing; meter board outside or in the veranda at least 5 feet up, visible service pipe; CEIG approval for buildings of 15 metres and above; no middlemen; insist on receipts and acknowledgements; special reading on change of occupancy, asked in writing at the ICSC at least 15 days ahead · read on 01-11-2026
    9. Documents Required for Title Transfer with Fees (December 2022)Southern Power Distribution Company of Telangana Limited (TGSPDCL), a) self-attested ID proof; b) indemnity bond on Rs.100 non-judicial stamp paper with photo; c) self-attested registered ownership document in the applicant's name; conditions 1–3 (company, joint ownership with NOC on Rs.10 stamp paper, legal heir with death certificate and legal heir certificate); d) payment modes; fees: LT Cat-I Rs.29.50, LT Cat-II Rs.59 (with 18% GST) · read on 01-11-2026
    10. General Terms & Conditions of Supply (as amended up to 26.10.2016, adopted by TSERC by Regulation 1 of 2014): Grievance RedressalSouthern Power Distribution Company of Telangana Limited (TGSPDCL), 7.4 Complaints regarding new connections: LT complaints first to the ADE (Operation), then the DE (Operation); note: the consumer may approach the Forum if the time frame is not kept · read on 01-11-2026
    11. TGNPDCL website: home pageNorthern Power Distribution Company of Telangana Limited (TGNPDCL), a Government of Telangana company, Supply related complaints 18004250028 or 1912 (24/7); Our Services: New Service Connection, Name / Category / Load Change; Consumer Info: Know Your Application Status, AGL Seniority List; Consumer Forum: Online Consumer Complaint Registration (CGRF) · read on 01-11-2026
    12. Application for Supply of Electricity at Low Tension (LT New Connection Form)Northern Power Distribution Company of Telangana Limited (TGNPDCL), Items 2(c)–(d) (service wiring, visible pipe, wiring completed, name, licence number and address of the licensed electrical contractor), 2(e) ("Are any other services existing in the same Premises … please give Service Connection Numbers"), 4 (Title Transfer: present consumer's name, new consumer's name, service connection number), 5–6 (connected load and appliances); 11, common to all LT categories: "Proof of ownership (Sale deed, Allotment/possession letters lease deed, Municipal tax payment receipt) or Proof of occupancy (Lease/ Rental deed with landlord, Electoral identity card or Passport or PAN card along with proof of ownership of landlord)", "Indemnity Bond (Letter of consent from landlord to tenant/ lessee/ occupier)", "Wiring Completion Report (from a licensed electrical contractor)"; commercial: "Valid municipal license for running commercial establishment"; SC or ST: "Necessary community certificate"; 12 iii–iv (no dues; no case of theft or unauthorised use pending); "Photo of the Customer"; "Signature of Original Owner (in case of title transfer)"; acknowledgement ("Total Payment Received", "Signature of the Receiving Officer with Stamp") · read on 11-11-2026
    13. Load wise category wise charges (including GST) (linked from the TGNPDCL website as "Category & Load Wise Charges")Northern Power Distribution Company of Telangana Limited (TGNPDCL), Chief General Manager (Commercial), LT table: Cat-I 1 kW: A-Form charges + 18% GST ₹30, security deposit ₹200, development charges + 18% GST ₹1,416, total ₹1,646; Cat-II 1 kW: ₹59, ₹800, ₹1,416, total ₹2,275; note on SLC by line length (older than TGERC Regulation 1 of 2026). Scanned, undated, signed under the former name TSNPDCL · read on 01-11-2026
    14. Forum for Redressal of Consumer Grievances: Complete Address and ContactsNorthern Power Distribution Company of Telangana Limited (TGNPDCL), Two forums for eighteen districts: CGRF Warangal (Hanumakonda, Warangal, Jangaon, Mulugu, Bhoopalpally, Mahabubabad, Karimnagar, Peddapally, Khammam, Kothagudem; landline 0870-2461551) and CGRF Nizamabad (Nizamabad, Kamareddy, Adilabad, Nirmal, Mancherial, Komaram Bheem Asifabad, Jagityal, Rajanna Sircilla; landline 08462-295942); addresses in the companion "CGRF Address" file · read on 01-11-2026
    15. TGERC (Establishment of Mechanism for Redressal of Grievances of Consumers) Regulation, 2026 (Regulation No. 06 of 2026)Telangana Electricity Regulatory Commission (copy published by TGNPDCL), Repeals Regulation 3 of 2015; 2.32 (new connection, change of name among grievances), 2.33–2.37 (in person, post, e-mail or online; acknowledgement), 2.38(c) (within two years), 2.52 (orders in 15 or 45 days), 3.21 (representation to the Vidyut Ombudsman within 45 days, one-third of any amount assessed deposited), 3.38 (Ombudsman's order within 60 days) (03-06-2026) · read on 01-11-2026
    16. Vidyut Ombudsman, Telangana: website, ContactVidyut Ombudsman, Telangana (website linked from TGSPDCL's website as "TG Vidyut Ombudsman"), Contact: phone 8500827424; address 1st Floor, 33/11KV Substation, Beside Hyderabad Boat Club, Near Lumbini Park, Hyderabad-500004, Telangana · read on 01-11-2026
    17. TGERC (Licensee's Duty for Supply of Electricity on Request) Second Amendment Regulation, 2026 (Regulation No. 01 of 2026), Telangana Gazette Extraordinary, Part II, No. 50Telangana Electricity Regulatory Commission (copy published by TGNPDCL), 1.2 (whole of Telangana), 1.3 (in force from publication in the Gazette, 19 January 2026); 2.1, proviso to clause 7.1: new LT connections or additional load through overhead lines, other than LT-VIII temporary supply and layout electrification, within 1 km radius of the electrified network: service line charges per contracted load, excluding terminal and metering arrangements (table i, LT-I Domestic: up to 1 kW ₹500; above 1 to 5 kW ₹500 plus ₹600 per kW or part; above 5 to 20 kW ₹2,900 plus ₹1,500 per kW or part; above 20 kW ₹10,000 per kW or part; table ii, LT-II Non-Domestic/Commercial, LT-VI, LT-VII: ₹1,000; ₹1,000 plus ₹1,200; ₹5,800 plus ₹2,000; ₹10,000 per kW; notes: combined contracted load for apartments, commercial complexes and multi-storied buildings); further proviso: the licensee supplies, erects and maintains the distribution transformer and does not charge its cost; 3, clause 8.3 substituted: up to 20 kW, development charges (Annexure-I of Regulation 4 of 2013) plus these service line charges; above 20 kW, service line charges only (19-01-2026) · read on 01-11-2026
    18. Download FormsSouthern Power Distribution Company of Telangana Ltd (TGSPDCL), "Application and Procedure for Supply of Electricity (New / Additional Loads)": "Indemnity Bond Proforma"; "Title Transfer Application": "Indemnity Bond for Title Transfer", "No-Objection cum Consent Letter" · read on 01-11-2026
    19. Telangana MeeSeva portal: service pages (fee with GST, timeline, documents to upload, officer flow)Electronic Services Delivery (MeeSeva), ITE&C Department, Government of Telangana, Services → NPDCL: "NEW CONNECTION" (service 881): "Fee (with GST) 80", "User Charges 80"; "Mandatory Documents to upload: ID Proof; Municipality / Gram panchayat Permission Letter"; optional: "Aadhaar Xerox Copy", "Application Form", "Caste Certificate (Mandatory if SC / ST)", "Owner Ship Certificate / Sale Deed / Gift Deed (Selected Proof Document)", "Photo", "Wiring Certificate". "NAME CHANGE" (service 847): "Fee (with GST) 80"; mandatory: "Application Form", "Caste Certificate (Mandatory if SC / ST)", "ID Proof", "Indemnity Bond", "Latest Bill and Receipt", "Municipality / Gram panchayat Permission Letter", "Owner Ship Certificate / Sale Deed / Gift Deed(Selected Proof Document)", "Transfer Transfree Document" (footer: last updated 04-04-2026) (04-04-2026) · read on 04-11-2026